6.You must add lubricating grease for Rotary Piling Rig after working for five hours, and check the oil, hydraulic oil, gear oil level, bolt tightness, especially the tightness degree of drilling mast upper pipe joints and the wire rope connecting bolts. In case of abnormal sound must be shut down and check in order to ensure human and machine safety.
7.You must ensure the drilling mast rig down in the transfer process, and the centre of gravity is appropriate. While the road is wide enough, density enough, inclination is not allowed to exceed the specified value, to ensure safe shutdown to drill, and carry out the overall maintenance of oil filling work, at the same time the surface should be covered.
8.In the course of the drill, the crawler must be returned to the minimum 2700mm. In the work, the crawler is extended to the working position of the 4300mm.
9.The holes drilled in the drilling pile must be covered and clearly marked to ensure the safety of personnel.
Reman is China top Rotary Piling Rig Manufacturer and supplier with rich experience, welcome to contact us freely: remanmachinery@hotmail.com.
Recommending: Operation Rules of Rotary Piling Rig I